The Deeping St Nicholas Wind Farm consists of 8 turbines located
on land at Vine House Farm, and Worths Farm at Deeping St
Nicholas, Lincolnshire.
Construction of the wind farm commenced in May 2005 under
a turnkey contract between turbine suppliers Repower UK, and
Fenland Windfarms Ltd, a part of the EDF Group. Wind Prospect
acted as Planning Supervisors and Owners Technical Consultant
during the construction phase of the works. By 2006 all eight
turbines were constructed and now are fully operational.
The selected turbine is the REpower MM82, the same turbine installed at Long Hill
Road, March with an overall tip height of 100m.