 |
This site, in North Cumbria, holds six turbines alongside
an old wartime runway. From 1993-1999 the site housed ten
300kW turbines. Wind Prospect re-powered the site in 1999
for owners Cumbria Wind Farms, being the first in the UK to
do so.
| Capacity |
Number of
Turbines |
Turbine
Rating |
Homes
Supplied |
Saving of
Greenhouse
Gases |
| 4 MW |
6 |
660kW |
2,000 |
5,400
tonnes/year |
back
|