Welcome
Company
Portfolio
Community
Environment
Landowners
Offshore
International
Contact




Utilising the long disused Kirksanton Airfield, Haverigg is a great place for a windcluster, close to the sea and facing the prevailing southwesterly wind. The first windcluster was commissioned in 1992, only the second commercial wind energy development in the UK.

A second group of four 600kW turbines was commissioned on the same site in 1998.

Capacity Number of
Turbines
Turbine
Rating
Homes
Supplied
Saving of
Greenhouse
Gases
1.125MW


2.4MW

5


4
225kW


600kW
629


1300
1,500
tonnes/year

3,200
tonnes/year

back

 


Download site summary factsheet:
Haverigg [PDF 144kb]



 
 
Wind Prospect Ltd., 7 Berkeley Square, Clifton, Bristol, BS8 1HG
t: +44 (0)117 925 7798 f: +44 (0)117 945 2493 e: info@windprospect.com