Harwich

Number of turbines tba   Av. households supplied 2,555 households
Rating of turbines tba MW Carbon dioxide saved:    
Wind farm size 10 MW        Min CO2 displacement 6,439 tonnes p.a.
Predicted output 30,660 MWhr p.a.        Max CO2 displacement 26,368 tonnes p.a.
Note: The capacity factor used in these calculations is 35.00%.

The proposed Harwich wind farm is designed to comply with the Ontario Power Authority's Standard Offer Contract program for renewables. The project is situated near the town of Blenheim, Ontario, in the Municipality of Chatham-Kent. Harwich wind farm would consist of a maximum of six wind turbines, access roads, underground and overhead collection cables, and a small switching substation.No large transmission towers are proposed as part of this project. 

Visit the project website »

Documents

14/08/08 Open House notice
25/07/08 Notice of commencement
25/07/08 Newsletter

Project Manager

Kelly Browne
harwich@windprospect.ca
Harwich
Wind Farm
Harwich montage 1

Content Managed Website BristolContent Managed Website Bristol